Energy Storage Systems
Size storage capacity based on power, cycles and operating scenario.
From need to right architecture
Size storage capacity based on power, cycles and operating scenario. Rethink energy use, from production to consumption, with a focus on efficiency and sustainability. Scope; It is determined by evaluating existing systems, business priorities and operational constraints. Product selection and application details are clarified according to this evaluation.
Service scope
The following topics are evaluated in the Energy Storage Systems study. Final deliverables are included in the bid after discovery and analysis.
- 01Load analysis
- 02Battery sizing
- 03security architecture
- 04energy management
technical approach
Load analysis creates the initial input. Battery sizing and Security architecture are considered together; The operability of the application is supported by energy management.
- 01Load profile and site evaluation
- 02Protection coordination and measurement
- 03Monitoring and performance analysis
Application process
Consumption data, site conditions and connection requirements are evaluated. Technical feasibility and alternative scenarios are prepared. After the applicability and necessary permits are clarified, the engineering and installation phase begins. Measurements, commissioning checks and maintenance plan are delivered together.
Areas of use
It can be evaluated for peak load reduction and production-consumption balancing. Existing architecture, data sensitivity, physical conditions, and the organization's operational resources determine the limits of the application.
Expected benefits and validation
Target; To clarify decisions with load analysis and strengthen operational control through security architecture. Acceptance criterion: inclusion of degradation, temperature and cycling assumptions in the model. Benefits and durations are not guaranteed without discovery.
Frequently asked questions
01What does it take to start working on Energy Storage Systems?+
The current situation, peak load reduction and production-consumption balancing requirements, and the targeted result should be shared. In the first evaluation, the data and responsibilities required for load analysis are determined.
02How are scope and delivery criteria determined?+
Incorporation of degradation, temperature and cycling assumptions into the model. Scope, dependencies, excluded work and support conditions are clarified in writing in the proposal and implementation plan.
future togetherLet's shape it.
Let’s discuss your needs and design a technology journey that creates value for your business.