
Solar Installation
Apply engineering design with a focus on site quality and occupational safety.
From need to right architecture
Apply engineering design with a focus on site quality and occupational safety. Rethink energy use, from production to consumption, with a focus on efficiency and sustainability. Scope; It is determined by evaluating existing systems, business priorities and operational constraints. Product selection and application details are clarified according to this evaluation.
Service scope
The following topics are evaluated in the SPP Installation study. Final deliverables are included in the bid after discovery and analysis.
- 01Assembly plan
- 02DC and AC wiring
- 03grounding
- 04quality control
technical approach
The assembly plan forms the initial input. DC and AC wiring and Grounding are considered together; The operability of the application is supported by quality control.
- 01Load profile and site evaluation
- 02Protection coordination and measurement
- 03Monitoring and performance analysis
Application process
Consumption data, site conditions and connection requirements are evaluated. Technical feasibility and alternative scenarios are prepared. After the applicability and necessary permits are clarified, the engineering and installation phase begins. Measurements, commissioning checks and maintenance plan are delivered together.
Areas of use
It can be evaluated for rooftop and land type solar power plants. Existing architecture, data sensitivity, physical conditions, and the organization's operational resources determine the limits of the application.
Expected benefits and validation
Target; Clarifying decisions with the assembly plan and strengthening operational control through grounding. Acceptance criterion: documentation of assembly and electrical checks with test records. Benefits and durations are not guaranteed without discovery.
Frequently asked questions
01What is needed to start SPP Installation work?+
The current situation, requirements for rooftop and land type solar power plants and the targeted result should be shared. In the first evaluation, the necessary data and responsibilities for the assembly plan are determined.
02How are scope and delivery criteria determined?+
Documentation of assembly and electrical checks with test records. Scope, dependencies, excluded work and support conditions are clarified in writing in the proposal and implementation plan.
future togetherLet's shape it.
Let’s discuss your needs and design a technology journey that creates value for your business.
