Data Center Modernization
Improve capacity and availability limits in existing facilities through controlled modifications.
From need to right architecture
Improve capacity and availability limits in existing facilities through controlled modifications. Physical and digital infrastructures that address continuity, security and capacity together. Scope; It is determined by evaluating existing systems, business priorities and operational constraints. Product selection and application details are clarified according to this evaluation.
Service scope
The following topics are evaluated in the Data Center Modernization study. Final deliverables are included in the bid after discovery and analysis.
- 01inventory analysis
- 02pass order
- 03Capacity renewal
- 04comeback plan
technical approach
Inventory analysis forms the initial input. Transition sequencing and Capacity renewal are considered together; The operability of the application is supported with the return plan.
- 01Capacity and dependency analysis
- 02Network segmentation and access control
- 03Traceability and recovery tests
Application process
Current inventory, critical applications and dependencies are examined. Capacity, availability and recovery targets are defined. Implementation is accomplished with controlled change windows and a fallback plan. Delivery is completed with acceptance tests and operating documentation.
Areas of use
It can be considered for aging data center infrastructures. Existing architecture, data sensitivity, physical conditions, and the organization's operational resources determine the limits of the application.
Expected benefits and validation
Target; To clarify decisions through inventory analysis and strengthen operational control through capacity renewal. Acceptance criterion: measuring capacity and service impact before and after transition. Benefits and durations are not guaranteed without discovery.
Frequently asked questions
01What does it take to start a Data Center Modernization effort?+
The current status, requirements for aging data center infrastructures, and the intended outcome should be shared. In the first evaluation, the data and responsibilities required for inventory analysis are determined.
02How are scope and delivery criteria determined?+
Measuring capacity and service impact before and after transition. Scope, dependencies, excluded work and support conditions are clarified in writing in the proposal and implementation plan.
future togetherLet's shape it.
Let’s discuss your needs and design a technology journey that creates value for your business.