Data Center Design
Bring IT capacity and physical infrastructure together on the same needs map.
From need to right architecture
Bring IT capacity and physical infrastructure together on the same needs map. Physical and digital infrastructures that address continuity, security and capacity together. Scope; It is determined by evaluating existing systems, business priorities and operational constraints. Product selection and application details are clarified according to this evaluation.
Service scope
The following topics are evaluated in the Data Center Design study. Final deliverables are included in the bid after discovery and analysis.
- 01floor plan
- 02Capacity model
- 03Redundancy scenarios
- 04physical security
technical approach
The floor plan forms the initial input. Capacity model and Redundancy scenarios are evaluated together; Physical security and operability of the application are supported.
- 01Capacity and dependency analysis
- 02Network segmentation and access control
- 03Traceability and recovery tests
Application process
Current inventory, critical applications and dependencies are examined. Capacity, availability and recovery targets are defined. Implementation is accomplished with controlled change windows and a fallback plan. Delivery is completed with acceptance tests and operating documentation.
Areas of use
It can be evaluated for new facility and capacity expansion plans. Existing architecture, data sensitivity, physical conditions, and the organization's operational resources determine the limits of the application.
Expected benefits and validation
Target; The aim is to clarify decisions with the layout plan and strengthen operational control through redundancy scenarios. Acceptance criteria: comparison of the design with load, continuity and growth scenarios. Benefits and durations are not guaranteed without discovery.
Frequently asked questions
01What does it take to start working on Data Center Design?+
The current situation, requirements for new facilities and capacity expansion plans, and the targeted outcome should be shared. In the first evaluation, the necessary data and responsibilities for the layout plan are determined.
02How are scope and delivery criteria determined?+
Comparison of the design with load, continuity and growth scenarios. Scope, dependencies, excluded work and support conditions are clarified in writing in the proposal and implementation plan.